Next from DENAIR HVAC Projects & Engineering Records: compare multi-unit return routes and future service access.
Next from DENAIR HVAC Projects & Engineering Records: coordinate FCU access, existing controls and building permissions.
Next from DENAIR HVAC Projects & Engineering Records: coordinate commercial equipment operation and site access.
Port de la Mer confirms checked Nest controls, the showroom confirms a damper-actuator item and SpaceHUB reports completion of its recorded work. These are scoped confirmations, not unlimited whole-property performance claims.

Controls checked: Nest connected, app configured and rooms labelled. A separate leak and the extra controller request remain outside this confirmation.

Actuator item complete: the damper was to follow AC operation. Final whole-showroom air measurements are not recorded.

Site-work completion reported after an upstream supply-connection correction and top-up. Independent long-term operating data are not available.

Installation milestones recorded; commissioning open. Eight units pressure tested, seven indoor units connected and fresh-air installation reported complete.

Two FCU connections recorded, with only one operating at the check. The second actuator lacked power and its final correction is unconfirmed.

A 200 mm opening has local grille-velocity readings: 8.5 to 6 m/s on high and 4.5 m/s on low. The occupant outcome remains open.

Four controllers and two electrical blocks installed, with a later sound-source correction. Final top-up and all additional-scope acceptance remain unconfirmed.

Drive-error reset and restart recorded. Filter blockage remained a possibility, while later filtration work and lasting correction are not confirmed.