ENGINEERING PROJECT RECORD / OUTCOME OPEN

Commercial ceiling duct connection. From the St. Regis record; appearance alone does not establish a system outcome.

Air handling equipment in hotel project. From the St. Regis record; appearance alone does not establish a system outcome.
8.5 → 6 m/s
High fan mode / grille velocity before → after
4.5 m/s
Low fan mode / recorded after the opening change
200 mm
Opening cut / dimension recorded for the work
No final occupant, noise or whole-room outcome is established by the selected measurements.
Keep opening dimension, fan mode and measured velocity together. A local velocity reading is not a measurement of whole-room airflow, noise or comfort, and the source does not close those outcomes.
All project records →
Share the equipment, intended change and access constraints relevant to your property. The St. Regis record is an example of documented scope, not a diagnosis for another site.

