Restaurant Kitchen Exhaust: What to Review Beyond AC

Restaurant kitchen ventilation scope review before new cooking or appliance changes

Restaurant Kitchen Exhaust: What to Review Beyond AC

Restaurant Kitchen Exhaust: What to Review Beyond AC

Restaurant Kitchen Exhaust: What to Review Beyond AC

Plan a restaurant kitchen ventilation review around the cooking process, appliance list, exhaust route and replacement air before committing to AC or hood equipment.

Plan a restaurant kitchen ventilation review around the cooking process, appliance list, exhaust route and replacement air before committing to AC or hood equipment.

Plan a restaurant kitchen ventilation review around the cooking process, appliance list, exhaust route and replacement air before committing to AC or hood equipment.

By Denis Perevoshchikov

HVAC Engineer · Certified HVAC Specialist · Manager at DENAIR, Dubai

Planning a restaurant fit-out or changing the cooking equipment? Review the kitchen ventilation before ordering a larger AC unit or reusing the previous tenant's hood. The decision depends on what will be cooked, the appliances and the available exhaust route, not just the room temperature.

Fabricated HVAC duct sections arranged on a worktable

Duct components photographed during a DENAIR residential project. General coordination illustration, not a kitchen-exhaust specification.

Give cooking extraction its own design scope

Comfort cooling, removal of cooking emissions and replacement of exhausted air have different jobs. They need a coordinated design, even where some equipment or air supply serves more than one function. A cool dining room does not demonstrate that the cooking line has suitable extraction.

ASHRAE's 2023 Handbook, Chapter 34, sections 1–1.3, treats appliance selection, hood design, replacement air and HVAC integration as linked decisions. It is technical guidance, not evidence that a particular design or standard edition is approved for your Dubai premises.

Identify the activity that changes the brief

Give the kitchen ventilation designer an appliance-by-appliance account of the proposed operation. Use these questions to identify what needs review:

  • New cooking: are you adding cooking to a space previously used only for sales, drinks or food assembly?

  • A changed cooking line: will appliances, their positions, fuel or cooking methods change beneath an existing hood?

  • Different emissions: which operations produce grease or smoke, and which mainly release heat or steam?

  • A changed air route: will partitions, supply outlets or building connections change around the kitchen?

The designer should classify the actual process and select the appropriate arrangement. In the chapter's Hood Types section, Type I hoods handle grease and smoke; Type II hoods address heat or steam where grease and smoke are absent. An electric appliance is not automatically outside the exhaust review: fuel type is only one selection input.

If a supplier describes an appliance as ventless, request its exact model documentation and operating restrictions for the designer's review. Do not extend one product's claim to the entire cooking line or treat it as permission to omit building approvals.

Prepare a kitchen operating brief

Send the appointed, appropriately licensed designer and kitchen supplier the same dated information:

  • The menu and cooking methods, including intended future additions.

  • Appliance manufacturers, models, fuel types and supplier installation documents.

  • A scaled kitchen layout showing appliance positions and any retained hood.

  • Peak service demand, appliances used together, staff numbers and operating hours.

  • Dishwashing and other heat- or steam-producing equipment, identified separately.

The UK Health and Safety Executive's Ventilation in catering kitchens, CAIS10 revision 3, July 2017, pages 2–3, identifies cooking demand, equipment, menu, staffing and layout as design inputs. Use it as a practical briefing reference, not as Dubai legislation. Flag gas or solid-fuel cooking at the outset so the responsible specialists can review combustion, controls and operating requirements.

Confirm the route before committing to equipment

Ask the building team for the existing approved drawings and the provisions for your exact tenancy. Have the designer identify the proposed hood, duct route, fan, discharge point and replacement-air route. Mark which connections exist, which are only assumed and which require building confirmation.

For each unresolved connection, record the question, who will answer it and the purchase or construction decision that depends on it. For example, an available AC connection does not answer whether a proposed cooking exhaust can reach an acceptable discharge point. Ask for that answer before placing a hood or fan order.

Dubai Municipality's published 2013 Food Code, section 2.11 on page 20, addresses kitchen ventilation components, grease and condensation control, cleaning access and make-up air. Have the appointed team confirm the current requirements for the premises and activity. This older published edition is not a complete current approval checklist.

Ask for the connections between scopes to be explained

The proposal should say who designs, supplies, connects and checks each interface:

  • Kitchen and ventilation: the appliance schedule and hood selection used by both suppliers.

  • Exhaust and incoming air: how replacement air will be provided and how the arrangement affects adjoining rooms and cooling.

  • Building and tenant: the agreed connection, route, access and operating responsibilities.

  • Fire protection, fuel and controls: the specialists responsible for the applicable protection and interlocks, with their coordinated test scope.

Keep missing decisions visible in the quotation. A line labelled “AC and ventilation” is not enough to establish that these interfaces are included. Leave fan settings, gas connections, safety controls and fire-protection work to the authorised specialists.

Keep drawing approval and operating checks distinct

For projects within its remit, DDA's fit-out drawing schedule, ZA-DC-T-123 Issue 3, has an HVAC section specifically for food and beverages. It lists equipment schedules, approved and proposed fresh-air and ventilation layouts, and fan locations. Confirm the applicable submission route with your project team; this is not a Dubai-wide permit list.

At handover, request the designer's agreed acceptance criteria and the corresponding test records for the installed arrangement. Keep outstanding tests or building-side dependencies open with a named responsible party. Use our fit-out approval checklist for document coordination and the installation handover guide for the general HVAC records.

Share your proposed kitchen layout, appliance list and available building information with DENAIR to discuss the HVAC fit-out scope and its interfaces with your appointed kitchen ventilation and fire-safety specialists. For the wider tenancy brief, see our new-shop HVAC planning guide.

Explore the relevant scope

Bring the right details to your enquiry

Bring the right details to your enquiry

Bring the right details to your enquiry

Share the equipment, the rooms affected, previous work and available access. DENAIR can assess the relevant scope.