DENAIR

What Should an FCU Replacement Quotation Include?

Compare a chilled-water FCU replacement selection and scope

What Should an FCU Replacement Quotation Include?

What Should an FCU Replacement Quotation Include?

What Should an FCU Replacement Quotation Include?

Review a chilled-water FCU replacement quote: equipment selection, retained valves and controls, connection changes, building dependencies and handover evidence.

Review a chilled-water FCU replacement quote: equipment selection, retained valves and controls, connection changes, building dependencies and handover evidence.

Review a chilled-water FCU replacement quote: equipment selection, retained valves and controls, connection changes, building dependencies and handover evidence.

By Denis Perevoshchikov

HVAC Engineer · Certified HVAC Specialist · Manager at DENAIR, Dubai

A chilled-water fan-coil unit replacement quote should connect the proposed equipment to the water service, ducts and controls that will remain. Ask for three things alongside the price: a selection sheet for each unit, a clear list of retained and replaced components, and an agreed handover record.


Open FCU cabinet, fans and connected pipework above a ceiling

Open FCU cabinet, fans and pipework photographed during a DENAIR inspection.

This checklist covers replacing an FCU while retaining chilled-water cooling. If replacement itself is undecided, start with the motor repair or whole-unit replacement guide. A conversion to a different cooling system needs a separate design comparison.

Request a selection sheet, not just a capacity label

Give each proposed unit a room or asset reference. Request its full model and configuration, quantity and the manufacturer's selection output showing:

  • Total and sensible cooling capacity at the stated entering-air temperature and humidity conditions.

  • Entering and leaving water temperatures, required water flow and coil pressure drop.

  • Airflow, selected fan setting and external static pressure, meaning the pressure available to overcome resistance outside the unit.

Daikin's FWE-FF technical table separates these performance quantities and gives the conditions behind its cooling ratings. It illustrates the information needed; its values are not targets for every FCU.

Ask the designer to explain how the selection meets the room duty using the available water and intended air path. If a bedroom proposal relies on a high fan setting, ask how its sound data relates to the planned use. Two headline capacities are not a like-for-like comparison when their selection conditions differ.

Draw the boundary of the water-side work

Request a marked connection sketch showing where the contractor's work starts and ends. Against the coil, control valve, actuator, balancing provision, isolating valves, strainer and flexible connections, state what is supplied new, retained, altered or awaiting inspection. “Complete FCU replacement” should not leave those decisions implicit.

Ask the responsible engineer to confirm that the selected assembly suits the available flow, differential pressure, system pressure and water quality. Carrier's 42EP instructions treat water-side operating limits, water quality and optional control and balancing valves separately. A coil's operating-pressure limit and the pressure available to drive water through it answer different questions.

Have the quote name who confirms that the existing isolation is usable and arranges any building attendance or shutdown. Include responsibility for draining, refilling, venting, water-flow adjustment and the necessary checks after reconnection. Identify any proposed flushing separately, including its extent and compatibility review; do not accept an undefined whole-system treatment as an automatic replacement extra.

Specify the control interfaces that will remain

Ask for the proposed controller, fan-motor type and valve-actuator details, with the supply and command requirements checked against the equipment that stays. Carrier's manual, for example, distinguishes actuator voltages and control types. Matching a connector or retaining the same wall display does not establish compatibility.

Put any new controller, interface module, wiring, configuration or building-management integration on the priced scope. Ask who checks the full response from a room command to the fan and valve. If one contractor supplies the unit and another configures the controls, name who accepts the combined operation.

Price the physical adaptations against this model

Request a sketch of the actual cabinet, connection side, supports, duct transitions and service space. Ask the survey to identify how the old unit leaves and the new one enters, which ceiling areas open, and who reinstates them. Have the contractor identify retained filters, plenums and any fresh-air connection, including how each will suit the replacement.

Keep the drain decision specific to the proposed outlet and installation. Our replacement drain-route guide covers what to establish before accepting reuse. The quotation should state the resulting work, including any pump or protection arrangement, rather than repeat “connect to existing” without a surveyed basis.

Agree acceptance evidence before ordering

Ask for the checks, records and responsible parties that will close the replacement scope. Trane's UniTrane manual separates installation checks, pre-start checks and operating sequences. Its examples include piping leaks, drainage, fans, electrical checks and controls. Your installer should use the instructions for the actual equipment.

Request a handover schedule tied to the unit references and selection sheets. It should identify the applicable connection and drainage checks, recorded water-flow setting or verification, delivered airflow, control response and room operating observations. Agree the relevant acceptance criteria and test conditions with the responsible designer, rather than inserting a universal temperature difference.

Keep measured results separate from design values. Our chilled-water readings guide explains why water temperatures alone cannot establish delivered cooling. If building water, completed ductwork or controls are unavailable for a required check, record what remains unverified and who arranges the return visit.

Make allowances and retained-equipment cover explicit

Ask for each unresolved item to have a defined inspection step and written approval point before additional work proceeds. An untested isolation valve, for example, needs a stated contingency rather than an unlimited allowance. Confirm equipment lead time and the expected cooling interruption with the parties arranging access.

Separate the new unit's warranty from installation labour, retained valves or controls, and repeat ceiling-access costs. Request the actual coverage and exclusions in writing. Use the general installation quote checklist for the wider commercial comparison.

Leave ceiling access, water-system work and electrical testing to qualified professionals. Share the existing equipment details, inspection findings and proposed selection sheets with DENAIR's AC installation team to discuss a defined FCU replacement scope.

Explore the relevant scope

Bring the right details to your enquiry

Bring the right details to your enquiry

Bring the right details to your enquiry

Share the equipment, the rooms affected, previous work and available access. DENAIR can assess the relevant scope.

DENAIR

HVAC repair, maintenance, installation and fresh-air work for Dubai properties.

DENAIR is operated by BAFOEV TECHNICAL SERVICES L.L.C. Dubai DET License No. 1118204.