Clinic owner planning a new facility or changed healthcare activity; healthcare design basis before ordinary comfort-AC procurement.
HVAC Engineer · Certified HVAC Specialist · Manager at DENAIR, Dubai
Opening a clinic or changing the services offered in an existing one? Establish the healthcare activity and room functions before treating the work as an ordinary AC replacement. The appointed healthcare designer needs to decide which ventilation, extraction and room conditions the proposed use requires, then coordinate those decisions with comfort cooling.

Duct components photographed during a DENAIR residential project. General HVAC coordination illustration, not a clinical project or healthcare duct specification.
Start with the healthcare activity, not the business name
Give the design team a written description of the intended services, the facility category being pursued and the authority responsible for the premises. Identify the person responsible for the clinical brief alongside the healthcare design consultant. A label such as “clinic”, “wellness” or “treatment room” is not enough to select an environmental design.
For DHA-licensed outpatient facilities, the Standards for Outpatient Facilities document, Version 1, was issued on 19 November 2024 and became effective on 19 January 2025. Section 6.1 refers to the Health Facility Guidelines' outpatient-unit chapter. This is a defined healthcare scope, not a ventilation rule for every business using the word “treatment”. Have your consultant confirm the applicable current documents and any activity-specific requirements.
A salon layout, a restaurant kitchen and a healthcare facility raise different questions. Likewise, a consultation room should not inherit a hospital isolation-room or operating-room specification merely because all involve healthcare. The responsible specialist must establish the actual room classification.
Separate three questions in the HVAC proposal
Comfort cooling: what cooling demand, equipment and controls serve the occupied rooms?
Room ventilation and environmental conditions: what outdoor air, air movement between spaces, filtration or other room conditions does the proposed activity require?
Process or local extraction: does a particular item of equipment or activity need extraction at its source, a dedicated discharge route or another specialist system?
These questions may involve connected systems, but each needs an identified design basis. Ask the consultant which apply to each room and which do not. A room reaching its temperature setpoint does not answer the ventilation or extraction questions. Equally, a room named “clinic” does not establish that it needs negative pressure or a separate exhaust fan.
The mechanical chapter currently linked from DHA's live Health Facility Guidelines, Part E, is labelled Version 1.0. Its stated scope covers new construction and major renovation of DHA-licensed healthcare facilities, and it is written for the design team. Use the live source with the relevant room documents. This article does not supply air-change rates, pressure targets or a healthcare system specification.
Prepare a room-use brief the designer can assess
Number the rooms on the proposed plan and use the same references in the equipment list. For each room, provide:
The actual function: consultation, examination, a specifically described procedure, equipment processing, storage, staff use or another defined activity. Ask the clinical lead to resolve ambiguous labels.
The proposed operation: who uses the room, expected occupancy, operating periods and any future service being considered.
The equipment: exact models and manufacturer installation information, including any stated heat, moisture, exhaust or utility needs.
The surroundings: adjoining rooms, normal door arrangements and connections to shared building services.
The existing evidence: approved drawings, previous room use, equipment records and what remains unverified on site.
Include support spaces in the brief. If instrument processing or another specialised activity is proposed, identify the process and equipment for specialist assessment rather than describing it as a generic back room. The list is a way to collect design inputs, not permission to provide a service or a recommendation to add one.
Keep patient names, records and images out of the HVAC enquiry. Room functions and equipment information can be supplied without identifiable patient data.
Review changed use before retaining the old system
Request a fresh specialist review when taking over former retail premises, changing clinical services, converting a room to another function or adding equipment with different environmental needs. Moving partitions can also alter the arrangement that the earlier design was based on.
Ask the designer to compare the proposed room-use brief with the documented existing installation. For each retained element, record whether its suitability is confirmed, requires an alteration or remains dependent on a survey. An old approval or a working AC unit should not be treated as evidence that a different healthcare use is supported.
Resolve the building interfaces before purchasing equipment. Which team confirms the available outdoor-air connection, permitted discharge route, operating schedule and access? If a required route is unconfirmed, ask what design and purchase decisions must wait. Our fit-out approval checklist covers the general document workflow; the healthcare consultant must establish the additional requirements for this project.
Make specialist responsibilities visible in the quotation
Ask the proposal to name who establishes the healthcare design criteria, coordinates the clinical brief, designs the HVAC and any process extraction, prepares submissions and verifies the installed result. State the work included in each contractor's appointment and any specialist scope still to be appointed.
Where the design requires a room pressure relationship, dedicated extraction or particular control behaviour, ask the responsible designer to identify it in the room schedule and coordinated drawings. Request an explanation of the interfaces with adjacent spaces and building systems. Leave calculations, equipment selection, balancing and control settings to the qualified team.
Do not accept an unspecified “medical-grade AC” label as the description of these responsibilities. Ask for the applicable room criteria, equipment documentation and verification scope behind the proposal.
Agree the evidence needed before use
Before installation, ask the designer and commissioning lead to agree the checks for the final room functions and system arrangement. The handover record should connect each required check to the room or equipment reference, design criterion, test conditions and result. Any untested function needs a named responsible party and a clear next step.
Keep technical test results, building closeout and healthcare permissions as separate records. A cooling demonstration or general airflow report cannot by itself establish that all requirements for clinical use have been met. For an occupied facility, have the facility's responsible team agree the work-area and service arrangements before alterations begin.
Share the proposed room layout, declared services, equipment list and your healthcare consultant's design brief with DENAIR to discuss the HVAC fit-out scope and its interfaces. Confirm the specialist healthcare design and approval responsibilities separately before appointing the work.
Explore the relevant scope
Share the equipment, the rooms affected, previous work and available access. DENAIR can assess the relevant scope.
HVAC repair, maintenance, installation and fresh-air work for Dubai properties.
DENAIR is operated by BAFOEV TECHNICAL SERVICES L.L.C. Dubai DET License No. 1118204.