Mark the service path, not just a square on a plan
For each concealed unit, identify the filter path, fan and coil access, drain pan and trap, valves, electrical/control compartment and any connection that requires inspection. Mark the clearance and removal direction specified for that model. Check whether a worker can reach the component after lights, sprinklers and framing are installed. Dimensions cannot be copied from another project's hatch.
At Jumeirah Islands, the recorded visit could not access the indoor units for service (16792). At Bluewaters, ceiling height and hatch position constrained the arrangement (17433). Burj Khalifa plenum work also had to respect a future ceiling line and sprinklers (10656). These records describe distinct constraints; they do not establish a universal hatch size.
Hold a pre-closure review
Ask the contractor to label each unit and show its access route in the unfinished ceiling. Photograph the unit, hatch location and neighbouring services with permission. List any component that cannot be reached, the proposed correction and who must approve the ceiling change. Close the ceiling only after the service route is agreed and the remaining exceptions are documented.
If an existing ceiling is already closed, ask for a survey and a limited opening proposal before assuming a planned hatch will reach the needed component. The cost and finish implications belong in the scope, not in an unspoken assumption.

Blue Waters ceiling services before finishes; access needs to be checked against the actual equipment.